Option 1



Drawing:





Technical Specification:
1st Melting Furnace (A)
– 15Tons
– 90 KW direct Electric heating type
– Feeding Unit for melted lead from 1st furnace to 2nd furnace.
2nd Melting Furnace (B)
– 6Tons
– 40 KW direct Electric heating type.
Strip Caster (C)
– Welded steel basement structure
– peed control motor : inverter control
– Casting wheel : Diameter – 800mm,
– Groove Width – 110mm (max. 115),
– Groove Thickness – Less 11mm
– Water cooling type
– Steel belt.
Tension Unit (D)
– Speed controller
– Balancing unit for strip caster and rolling mill.
Technical Specification:
Strip cutting Unit (E)
– Automatic Wrought Strip cutting unit
– Cut the wrought strip produced by Casting Machine in case of necessary after the operator check the wrought strip with the naked eyes
Rolling Mills (F)
– Chain driving process
– Water cooling system
– Adjustable strip thickness : 0.7 ~ 1.1 mm
In case of 0.7mm, the speed is 60m/min
– Motor : 11 Kw * 7 sets
– Slitting and chopping unit of scrap
– Scrap return conveyor
Twin Reel Coiler (G)
– Full automatic
– Vertical coiling



Option 2